{"bd":{"bdName":"PUR240900202/国家管网樟木头分输站至樟洋电厂接气工程(东莞昆仑)控制系统项目","bdBH":"PUR240900202","zbwjIsSell":"1","yswjIsSell":"1","ysWJHuoQuStartTime":1725842049000,"ysWJHuoQuEndTime":1725843600000,"zbWJHuoQuStartTime":1725842049000,"zbWJHuoQuEndTime":1725843600000,"zbWJZhiYiEndTime":1725670800000,"ysWJZhiYiEndTime":1725670800000,"zbWJDaYiEndTime":1725670800000,"tbWJDiJiaoEndTime":1725843600000,"ysWJDaYiEndTime":1725670800000,"sqWJDiJiaoEndTime":1725843600000,"ysKaiQiTime":1725843600000,"yswjbsJinE":0,"zbwjbsJinE":0,"shouBiaoDiDian":"深圳能源供应商门户(isp.sec.com.cn)","kbTime":1725843600000,"dayLimit":50,"kbDiDian":"所有报价文件必须通过深圳能源供应商门户(isp.sec.com.cn)递交","isBaoMing":0,"bmStartTime":null,"bmEndTime":null,"dayLimitShuoMing":"交货期:合同签订后50天","zbFanWei":"主要内容:\n
(1)按设计方案提供符合技术规范书要求的接气工程控制系统及控制系统设计、供货、安装、调试工作。\n
(2)电气ups装置的设计、供货、安装、调试工作。\n
(3)可燃气体泄漏探测报警系统的设计、供货、调试工作。\n
(4)流量计算机的安装、调试工作。\n
(5)在接气工程撬体厂家的配合下完成整个工艺系统的联合调试及投运工作。\n具体内容及相关要求见《国家管网樟木头分输站至樟洋电厂接气工程(东莞昆仑)控制系统技术规范书》。","ziZhiYaoQiu":"
(1)参与单位须是在中华人民共和国境内注册的国内独立法人;\n
(2)参与单位应具有有效的 GB/T19001 或 ISO9001 质量体系认证证书及有效的 GB/T24001 或 ISO14001环境管理体系认证证书;\n
(3)投标方应具有2014年1月1日以来燃气发电机组天然气调压站或同类型项目控制系统的1个及以上供货业绩,需提供项目名称、产品规格型号及主要技术参数、签订合同时间、有效业绩合同复印件、招标方联系人及联系方式等;\n