南汇新城镇装修垃圾残渣外运和处置服务项目的公开招标公告
项目概况
Overview
南汇新城镇装修垃圾残渣外运和处置服务项目招标项目的潜在投标人应在上海市政府采购网获取招标文件,并于2025年02月10日 15:00(北京时间)前递交投标文件。
Potential bidders for Nanhui New Town decoration waste residue transportation and disposal service project should obtain the tender documents from (Shanghai Government Procurement Network)and submit the bid document before 10th 02 2025 at 15.00pm(Beijing time) .
一、项目基本情况
1. Basic Information
项目编号:310115145241125150795-15187067
Project No.: 310115145241125150795-15187067
项目名称:南汇新城镇装修垃圾残渣外运和处置服务项目
Project Name: Nanhui New Town decoration waste residue transportation and disposal service project
预算编号:1524-W145143882
Budget No.: 1524-W145143882
预算金额(元):6000000元(国库资金:0元;自筹资金:6000000元)
Budget Amount(Yuan): 6000000(国库资金:0元;自筹资金:6000000元)
最高限价(元):包1-6000000.00元
Maximum Price(Yuan): Package No.1 for 6000000.00 Yuan,
采购需求:
Procurement Requirements:
包名称:南汇新城镇装修垃圾残渣外运和处置服务项目
Package Name: Nanhui New Town decoration waste residue transportation and disposal service project
数量:1
Quantity: 1
预算金额(元):6000000.00
Budget Amount(Yuan): 6000000.00
简要规格描述或项目基本概况介绍、用途:为响应高标准推进“无废城市”建设,进一步规范和加强装修垃圾分拣残渣资源化利用、无害化处理,对装修垃圾分拣后剩余难以利用的废弃物,经过再次分选后产生的可以进入生活垃圾焚烧设施处理的可燃固体废弃物,确保装修垃圾规范处置。临时堆点位于南汇新城镇万水路南侧天骄路东侧,占地面积约2万平方米。为进一步提升临港新片区开发建设的整体形象,缓解堆场库存压力,项目主要对装修垃圾残渣进行外运。
Brief specification description or basic overview of the project: In response to the high standards for promoting the construction of "Zero Waste City", further standardizing and strengthening the resource utilization and harmless treatment of waste, the waste that is difficult to utilize after sorting construction waste, after further sorting, the combustible solid waste that can be processed in the municipal solid waste incation facility is produced to ensure the standard disposal of construction waste. The temporary storage point is located on the south side of Wanshui Road and the east side Tianjiao Road in Nanhui New City, covering an area of about 20,000 square meters. In order to further improve the overall of the development and construction of the Lingang New Area and alleviate the pressure of the stockyard, the project mainly transports the construction waste residue out
合同履约期限:自合同签订起一年