项目概况
Overview
2025年水闸(泵闸)综合养护费招标项目的潜在投标人应在上海市政府采购网获取招标文件,并于2025年03月19日 10:00(北京时间)前递交投标文件。
Potential bidders for 2025 Watergate (Pumpgate) Comprehensive Maintenance Fee should obtain the tender documents from (http://www.zfcg.sh.gov.cn/)and submit the bid document before 19th 03 2025 at 10.00am(Beijing time) .
一、项目基本情况
1. Basic Information
项目编号:310115000241121149656-15192191
Project No.: 310115000241121149656-15192191
项目名称:2025年水闸(泵闸)综合养护费
Project Name: 2025 Watergate (Pumpgate) Comprehensive Maintenance Fee
预算编号:1525-00000242, 1525-00000243, 1525-00000245, 1525-00000244
Budget No.: 1525-00000242, 1525-00000243, 1525-00000245, 1525-00000244
预算金额(元):43320400元(国库资金:43320400元;自筹资金:0元)
Budget Amount(Yuan): 43320400(国库资金:43320400元;自筹资金:0元)
最高限价(元):包1-10256400.00元,包2-12350200.00元,包3-10211400.00元,包4-10502400.00元
Maximum Price(Yuan): Package No.1 for 10256400.00 Yuan,Package No.2 for 12350200.00 Yuan,Package No.3 for 10211400.00 Yuan,Package No.4 for 10502400.00 Yuan,
采购需求:
Procurement Requirements:
包名称:包件一
Package Name: Package One
数量:1
Quantity: 1
预算金额(元):10256400.00
Budget Amount(Yuan): 10256400.00
简要规格描述或项目基本概况介绍、用途:大治河东水闸、滴水湖出海闸、芦潮引河水闸、芦潮港水闸为包件一,全面负责上述水(泵)闸的安全运行,及时执行区水闸中心的运行调度指令,负责水(泵)闸设施设备的日常运行、检查、维修养护以及环境保洁等。
Brief specification description or basic overview of the project: The Dazhi River East Water Gate, the Dropping Lake Outlet Gate, the Luqiao Diversion River Water Gate, and the Luqiao Port Water Gate are package one, fully responsible for the safe operation of the aforementioned water (pump) gates. They promptly execute the operation schedu ling instructions from the district water gate center, are responsible for the daily operation, inspection, maintenance, and cleaning of water (pump) gate facilities and equipment, as well as environmental sanitation.
包名称:包件二
Package Name: Package Two
数量:1
Quantity: 1
预算金额(元):12350200.00
Budget Amount(Yuan): 12350200.00
简要规格描述或项目基本概况介绍、用途:三甲港水闸、张家浜东水闸、五号沟水闸、外高桥泵闸、严家港泵闸、赵家沟东泵闸为包件二,全面负责上述水(泵)闸的安全运行,及时执行区水闸中心的运行调度指令,负责水(泵)闸设施设备的日常运行、检查、维修养护以及环境保洁等。
Brief specification description or basic overview of the project: The second package includes the Sanyagang Watergate, Zhangjiabang East Watergate, Wugou Watergate, Waigaoqiao Pumpgate, Yanjia Port Pumpgate, and Zhaojiaogou East Pumpgate. This package is fully responsible for the safe operation of these water (pump) gates, promptly executing the operation schedul ing instructions from the District Watergate Center. It also covers the daily operation, inspection, maintenance, and cleaning of water (pump) gate facilities and equipment.
包名称:包件三
Package Name: Package Three
数量:1
Quantity: 1
预算金额(元):10211400.00
Budget Amount(Yuan): 10211400.00
简要规格描述或项目基本概况介绍、用途:洋泾水闸、西沟水闸、东沟水利枢纽、高桥套闸、仓房水闸、三岔港水闸、虬江水闸为包件三,全面负责上述水(泵)闸的安全运行,及时执行区水闸中心的运行调度指令,负责水(泵)闸设施设备的日常运行、检查、维修养护以及环境保洁等。