上海川沙路(龙东大道-沈沙港)雨污水管道改扩建工程-代建的竞争性磋商公告
项目概况
Overview
川沙路(龙东大道-沈沙港)雨污水管道改扩建工程-代建采购项目的潜在供应商应在上海市政府采购网获取采购文件,并于2025年05月07日 13:30(北京时间)前提交响应文件。
Potential Suppliers for Chansha Road (Longdong Avenue - Shen Sha Port) Rainwater and Sewage Pipe Reconstruction Project - Construction Agency should obtain the procurement documents from (Shanghai Municipal Government Procurement Network) and submit response documents before 07th 05 2025 at 13.30pm(Beijing time).
一、项目基本情况
1. Basic Information
项目编号:310115000250319194520-15223987
Project No.: 310115000250319194520-15223987
项目名称:川沙路(龙东大道-沈沙港)雨污水管道改扩建工程-代建
Project Name: Chansha Road (Longdong Avenue - Shen Sha Port) Rainwater and Sewage Pipe Reconstruction Project - Construction Agency
预算编号:1525-W00014339
Budget No.: 1525-W00014339
采购方式:竞争性磋商
Procurement method : competitive consultation
预算金额(元):3470000元(国库资金:3470000元;自筹资金:0元)
Budget Amount(Yuan): 3470000(National Treasury Funds: 3470000 Yuan; Self-raised Funds: 0 Yuan)
最高限价(元):包1-3470000.00元
Maximum Price(Yuan): Package No.1 for 3470000.00 Yuan,
采购需求:
Procurement Requirements:
包名称:川沙路(龙东大道-沈沙港)雨污水管道改扩建工程代建服务
Package Name: Chansha Road (Longdong Avenue - Shen Sha Port) Rainwater and Sewage Pipe Reconstruction and Expansion Project Proxy Construction Service
数量:1
Quantity: 1
预算金额(元):3470000.00
Budget Amount(Yuan): 3470000.00
简要规则描述:本项目为雨污水管道工程,并同步对川沙路(吕家浜-雁晓路)进行改造,具体实施范围是:沿川沙路(龙东大道-沈沙港)按规划敷设DN800-DN3500 雨水管,总长约2.86 公里;沿川沙路(龙东大道-沈沙港)按规划敷设DN300-DN1200 污水管,总长约2.24 公里;川沙路(吕家浜-雁晓路)改造范围北起吕家浜南侧,南至雁晓路,道路全长约0.44 公里,规划道路红线宽40 米,规划道路等级为城市次干路,现状双向5 车道调整为双向6 车道。主要建设内容是:雨污水排管工程,道路工程,道路、绿化修复等相关附属工程,以及管线、绿化搬迁等前期工作。本次招标的具体项目内容、采购范围及所应达到的具体要求,以磋商文件相应规定为准。
Brief Specification Description: This project involves a rainwater and sewage pipeline project and the simultaneous renovation of Chansha Road (Lüjia Bang - Yan Xiao Road) The specific implementation scope is as follows: along Chansha Road (Longdong Avenue - Shen Sha Port), DN800-DN3500 rainwater are laid according to the plan, with a total length of about 2.86 kilometers; along Chansha Road (Longdong Avenue - Shen Sha Port), D300-DN1200 sewage pipes are laid according to the plan, with a total length of about 2.24 kilometers; the renovation scope ofansha Road (Lüjia Bang - Yan Xiao Road) starts from the south side of Lüjia Bang in the north and ends at Yan Xiao Road in the, with a total road length of about 0.44 kilometers. The planned road red line is 40 meters wide, and the planned road grade is a secondary urban road The current two-way 5-lane road is adjusted to a two-way 6-lane road.
合同履约期限:签约到工程竣工交付使用全过程的建设管理代建工作。
The Contract Period: Construction management and agency construction work from signing the contract to the completion and delivery of the project for use.
本项目(否)接受联合体投标。