上海临港新片区奉贤园区垦洲路(中港水闸路-正博南路)道路新建工程管线搬迁的公开招标公告
项目概况
Overview
临港新片区奉贤园区垦洲路(中港水闸路-正博南路)道路新建工程管线搬迁招标项目的潜在投标人应在上海市政府采购网获取招标文件,并于2025年09月09日 13:30(北京时间)前递交投标文件。
Potential bidders for Pipeline Relocation for the New Road Construction Project of Kunzhou Road (from Zhonggang Shuizha Road to Zhengbo South Road) in Fengxian Park, Lingang New Area should obtain the tender documents from (Shanghai Government Procurement Network)and submit the bid document before 09th 09 2025 at 13.30pm(Beijing time) .
一、项目基本情况
1. Basic Information
项目编号:310000000250704121579-00256692
Project No.: 310000000250704121579-00256692
项目名称:临港新片区奉贤园区垦洲路(中港水闸路-正博南路)道路新建工程管线搬迁
Project Name: Pipeline Relocation for the New Road Construction Project of Kunzhou Road (from Zhonggang Shuizha Road to Zhengbo South Road) in Fengxian Park, Lingang New Area
预算编号:0025-W00018012
Budget No.: 0025-W00018012
预算金额(元):11136800元(国库资金:0元;自筹资金:11136800元)
Budget Amount(Yuan): 11136800(国库资金:0元;自筹资金:11136800元)
最高限价(元):包1-9590723.06元
Maximum Price(Yuan): Package No.1 for 9590723.06 Yuan,
采购需求:
Procurement Requirements:
包名称:临港新片区奉贤园区垦洲路(中港水闸路-正博南路)道路新建工程管线搬迁
Package Name: Pipeline Relocation for the New Road Construction Project of Kunzhou Road (from Zhonggang Shuizha Road to Zhengbo South Road) in Fengxian Park, Lingang New Area
数量:1
Quantity: 1
预算金额(元):11136800.00
Budget Amount(Yuan): 11136800.00
简要规格描述或项目基本概况介绍、用途:临港新片区奉贤园区垦洲路(中港水闸路-正博南路)道路新建工程管线搬迁,本次建设项目位于临港奉贤园区西南部,西起中港水闸路东至正博南路,道路规划等级为城市次干路,设计速度40千米/小时,红线宽度 32 米,全长约 1.47 千米。具体见后附工程量清单及施工图纸。
Brief specification description or basic overview of the project: Pipeline Relocation for the New Road Construction Project of Kenzhou Road (from Zhonggang Shuizha Road to Zhengbo South Road) in Fengxian Park of Lingang New Area
This construction project is located in the southwest of Lingang Fengxian Park, starting from Zhonggang Shuizha Road in the west and ending at Zhengbo South Road in the east. The planned grade of the road is an urban secondary trunk road, with a design speed of 40 kilometers per hour, a red line width of 32 meters, and a total length of approximately 1.47 kilometers. For details, please refer to the attached bill of quantities and construction drawings.
合同履约期限:30日历天
The Contract Period: 30 calendar days
本项目(否)接受联合体投标。
Joint Bids: (NO)Available.
二、申请人的资格要求
2. Qualification Requirements for Bidder
(a)满足《中华人民共和国政府采购法》第二十二条规定;
(a)Meet the provisions of Article 22 of the "Government Procurement Law of the People's Republic of China";
(b)落实政府采购政策需满足的资格要求: